Customization: | Available |
---|---|
After-sales Service: | Yes |
Material: | Steel Structure |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Key Features:
Innovative Folding Technology:
DEEPBLUE's Foldable House 939# boasts advanced folding technology that streamlines the pre-installation process. Approximately 80% of the assembly is completed at our factory, and then the folded unit is ready for convenient transportation inside a container. Upon arrival at your desired location, simply expand the main structure and assemble the furniture - it's that easy to put into use.
The Solution to Housing Shortages:
In cities facing severe housing shortages, the Foldable House 939# offers a solution. With a shortage of skilled construction workers and rising housing costs, our foldable house provides a sustainable, prefab solution that doesn't require a highly specialized workforce. It's designed for quick and efficient assembly, reducing the need for skilled labor.
Efficient and Customizable:
Our foldable houses are constructed using cutting-edge light steel frame technology, offering several advantages, including rapid construction, energy efficiency, and durability. The modular design allows for flexible layouts and customization, ensuring the house meets your unique requirements.
Transportation Made Easy:
Our foldable house can be designed in various sizes, with widths ranging from 2.3m to 5.8m and lengths up to 11.9m. After folding, it's a compact 1.1m to 2.2m wide, facilitating sea container transportation.
Ready for Use:
Our foldable houses come pre-finished in our factory, with 80% of the wall, roof, wiring, plumbing, and cladding already in place. This not only saves time but also minimizes the need for on-site labor, ultimately reducing construction costs.